The essentials in 30 seconds
- A foreigner cannot buy land freely in Mauritius: every purchase requires authorisation, and the plots for building a house are in estates approved by the EDB.
- In an IRS, a serviced plot of up to 1.25 arpent costs at least $350,000, and the house must be built within 5 years.
- In a PDS, a single plot of up to 2,100 m², and only if you already hold a residence permit, an Occupation Permit or a Permanent Residence Permit.
- The residence permit waits for the house: no application, and no resale of the land, before the building work is finished.
- The building permit (BLUP) is applied for online at the municipality or district council: 14 working days. Building without a permit puts you at risk of demolition.
Who can build in Mauritius?
Mauritian law on property ownership by foreigners is strict: a non-citizen can only buy property with authorisation from the Prime Minister's Office or the EDB. For a home of your own, the routes open to you go through estates approved by the EDB.
| Your situation | Build? |
|---|---|
| Non-resident foreigner | Yes, in an IRS, from $350,000 |
| Foreigner who is already resident | Yes, in an IRS or a PDS |
| Outside an approved estate | No, not without authorisation |
| Inherited property or through marriage | No authorisation needed: see a notary |
| Mauritian or registered diaspora | Yes, Smart City included |
Our advice
A plot offered to a foreigner "off-programme", without written authorisation, is a warning sign. Before paying anything, have a notary check that the purchase is permitted for you.
Serviced land: IRS, PDS or Smart City
A serviced plot comes with roads, walls, drainage, green spaces and utility connections. The estate developer sets architectural rules that your house must follow. EDB rules differ depending on the type of estate.
| IRS | PDS | |
|---|---|---|
| Who it is for | Any foreigner | Foreigners who are already resident |
| Plot size | 1.25 arpents at most | 2,100 m² at most |
| Minimum price | 350 000 $ | No written threshold |
| Build within | 5 years | 5 years |
| How many | — | 1 plot per foreigner |
What about the Smart City? Its serviced plots, of 2,100 m² at most, are reserved for Mauritians and registered members of the diaspora, who have 10 years to build. A foreigner buys a house or apartment there that is already built, or off plan.
In a PDS, the eligible residents are those who already hold a residence permit through property purchase (IRS, RES, IHS or PDS), an Occupation Permit or a Permanent Residence Permit. A retiree or a Premium Visa holder is not on this list.

Good to know
A foreigner's funds must come from abroad, through a bank licensed in Mauritius. To our knowledge, local banks do not lend to foreigners for these purchases: plan to pay for the land and the construction from your own funds.
The residence permit waits for the house
This is the point that surprises people most. Buying a plot, even for more than $375,000, does not yet give you the right to live in Mauritius. The EDB's rules are clear for plots under both the IRS and the PDS.
- No residence permit application until the house on the plot is finished;
- No resale or transfer of the plot before the house is completed;
- The permit comes afterwards, if the property reaches $375,000, and also covers the spouse and dependent children;
- $50 application fee per person, non-refundable, since 1 October 2026.
Our advice
During construction, you come as a visitor or with another permit. If living in Mauritius straight away matters more to you than building, a house that is already built or bought off plan gives you the permit sooner.
The building permit, the BLUP
In Mauritius, the building permit is called the Building and Land Use Permit, or BLUP. It is issued by the local authority: the municipal council in towns, the district council elsewhere. You must have it before any work starts, including on an estate.
-
1
The online application
Through the National E-Licensing System (NELS), the government's permit platform.
-
2
The consultations
The local authority itself consults water (CWA), electricity (CEB) and sanitation (WMA). Not in a land subdivision.
-
3
The permit
Issued within 14 working days, according to the EDB.
-
4
The building work
Run by a registered architect or engineer, who will sign off the completion of the works.
Two permits may be needed beforehand: a subdivision permit to divide a plot, and a conversion permit from the Ministry of Agro-Industry if the land is agricultural.
Good to know
Building without a permit exposes you to a fine and demolition, and a house cannot be occupied without its certificate. On an estate, the house must also follow the developer's architectural rules.
After the build: certificates and guarantees
-
1
Completion of works
Declared to the local authority on NELS.
-
2
Certificate of conformity
Issued within 5 days by the registered architect or engineer.
-
3
Certificate of occupancy
Issued on NELS within 5 days, on the strength of the certificate of conformity.
-
4
Water and electricity
Water is connected within 10 working days; electricity is requested online or at a CEB counter.
The Mauritian Civil Code protects the owner: the builder is liable for 10 years for serious defects in the structure, and for 2 years for minor works. Keep the plans, the permit, the invoices and the certificates: they are the proof of your house.
Our advice
Before choosing a builder, ask for the list of projects they have completed on the estate and call those owners. Have the deadline, the payment schedule and the late-completion penalties written into the contract.
Build or buy off plan?
Many estates also sell villas off plan: the developer builds, and you pay as the work progresses. This is a sale of property to be completed (VEFA), governed by the Mauritian Civil Code. For a Smart City, the EDB sets the payment schedule.
| Stage of construction | Share of the price |
|---|---|
| Signing of the deed | 30 % |
| Foundations | 5 % |
| House watertight | 35 % |
| Completion of works | 25 % |
| Handover of the keys | 5 % |
- Open to any foreigner, with no prior permit, including in a Smart City.
- A single point of contact: the developer holds the building permit and runs the build.
- 5% duties on purchase, paid in foreign currency, as for a plot of land.
In our files, buying can sometimes take a long time: some notaries refuse to submit the residence permit application, which can block everything. We check the estate, the contract and the notary with you before the first payment.
Sources: EDB: Guidelines for Buyers of Residential Property under the IRS / RES / PDS (January 2025), Smart City Scheme Guidelines (August 2026), Acquisition and Lease of Immovable Property by Non-Citizens (January 2025), business support portal (building permits and connections); Local Government Act 2018 (certificate of occupancy, MCCI and Port-Louis city council); Mauritian Civil Code (art. 1792); EDB press release of 4 November 2026; our client files. Read in November 2026.